Hartville, Ohio · Takeoffs for door & dock contractors
Find the door and dock scope in any bid set.
Commercial bid sets scatter overhead doors, dock equipment and smoke curtains across hundreds of drawing pages and spec sections. I go through the set, list what I find with the page each item is on, and flag what to ask before you price it. Your estimator checks it and prices the bid.
| Project | Item | Qty | Where it is | Flag |
|---|---|---|---|---|
| Warehouse | Sectional dock doors, 9'-0" × 10'-0" | 41 | Door schedule · Spec 08 36 13 | Schedule says manual, spec describes operators |
| Warehouse | Coiling doors, 12'-0" × 14'-0" | 2 | Door schedule · Spec 08 33 23 | Matches |
| Warehouse | Dock levelers | — | Mentioned in Spec 11 13 00, but not in its list of what the section includes | Confirm scope |
| Warehouse | Dock equipment quantities | — | On a drawing schedule that wasn't in the documents provided | Ask for the sheet |
| Multifamily | Trash compactor coiling doors | 3 | Only in the Door Hardware spec, p. 477 | Outside the door sections |
| Multifamily | Elevator smoke curtains | — | Spec 08 33 43, p. 419–423 · located on the life safety plans | Check the life safety plans |
Every line points back to the sheet or spec page it came from. Your estimator checks it and prices it; nothing is submitted for you. Open the full sample
What I do
The page-hunting part of the bid, done for you.
Is your scope in this set?
Before your estimator opens a 900-page set, I tell you whether overhead doors, dock equipment or smoke curtains are in it and on which pages, with those pages pulled into one file.
Door and dock counts
Coiling and sectional doors, rolling fire doors, dock levelers, seals and smoke curtains, listed from the schedules and checked against the specs, with the questions to ask before pricing.
Listed-but-missing checks
Spec sections the table of contents promises but the set doesn't include, flagged early so you can ask for them before bid day.
How it works
Small, specific, and on your terms.
Conversation
A 15-minute call. You walk me through how takeoffs happen today: what you get, where scope hides, and what takes the longest.
Sample takeoff
Send a bid set you've already finished. I do the takeoff and you compare it with yours.
Your call
You see what matched, what I missed and how long it took. You decide whether it's worth going further.
About
Kyle Myers
I've worked on a freight dock, where what's on paper and what's actually there don't always match. Finding what's buried in the paperwork is the part I like.
I built a tool that finds door and dock scope in a bid set and points to the page, and I check what it finds by hand before anything goes to you. I hold a business degree from Kent State University and run Myers System Integration LLC out of Hartville, Ohio. When you call, you talk to me.
- Your bid documents are never uploaded to a public AI tool. The search runs on my own computer; I use AI only to help organize the summary sheet.
- I'll sign an NDA before you share anything.
- Bid documents stay with me and are deleted when the work ends. I'll confirm it in writing.
- Nothing gets installed on your systems, so there's no IT setup.
- You own the bid. I find and list; your estimator checks and prices.
Right now
I'm talking with door and dock estimators.
I'm learning how commercial overhead door and loading dock contractors handle takeoffs: where scope hides in the drawings and specs, and what gets missed. If that's your world, I'd like 15 minutes to hear how you do it today. No pitch on that call.
Phone hours: Mondays and Tuesdays, 8 a.m. to 6 p.m. Eastern. Other days, leave a voicemail or email me and I'll get back to you.